欧美日韩国产中文字幕中文字幕色伊人|国产精品久久久久久久岛一本蜜乳日韩精品欧美精品一区二区|人妻互换免费中文字幕|星空文化传媒网页|裸体女人亚洲精品一区|漂亮人妻中文字幕|久久国产精品258av|国产精品久久久久久久久电影网|国产精品91麻豆|国产91精品网站,国产精品久久久久av福,国产精品久久久久久熟妇,中文字幕高清不卡在线

歡迎來(lái)到重慶和泰液壓升降機(jī)械廠 ,期待與您的合作,!

關(guān)于我們|聯(lián)系我們|收藏本站

重慶和泰液壓升降機(jī)械廠

重慶和泰液壓升降機(jī)械廠 一站式液壓升降平臺(tái)生產(chǎn)服務(wù)商

全國(guó)服務(wù)熱線189-0831-8192

重慶和泰液壓升降機(jī)械廠

重慶升降平臺(tái)機(jī)床如何進(jìn)行安裝?

來(lái)源:重慶和泰液壓升降機(jī)械廠 發(fā)布日期:2023-01-05 14:30:47

1,、用一根圓鋼棍穿過(guò)機(jī)床的基座,并用一根粗麻繩,,在圓鋼棍兩端各繞幾圈,,掛在起重機(jī)的吊鉤上,為了避免損傷機(jī)件,,必須墊放兩塊木塊,。在吊起之前,,應(yīng)卸下手輪、墊圈和螺母,。
Hangzhou with a round stick through the freight elevator machine base, and with a thick rope, in round stick around a few times at each end, hanging on the crane hook, in order to avoid damage to Hangzhou freight elevator parts, must mat put two pieces of wood. Before lifting, remove the hand wheel, washers and nuts.
 
2,、以煤油洗去杭州貨梯防銹涂層,用手搖轉(zhuǎn)手輪使全部活動(dòng)部分達(dá)到全行程,,同時(shí),,將潤(rùn)滑油涂在滑承面上。
Hangzhou Huoti kerosene wash antirust coating, with a hand wheel to resell part of all activities to reach full travel, while the lubricant is applied to the slide bearing surface.
 
3,、重慶升降平臺(tái)地基的負(fù)荷力必須經(jīng)過(guò)試驗(yàn),,在安裝前,水泥基礎(chǔ)應(yīng)已經(jīng)干透并已結(jié)硬,。在機(jī)床底下應(yīng)盡量多插入鐵楔,,機(jī)床在基礎(chǔ)上固定之前,必須用準(zhǔn)確的水平儀來(lái)校準(zhǔn),。水平儀首先校正縱向,,隨后校正橫向。調(diào)整機(jī)床時(shí),,工作臺(tái)應(yīng)停放在正中位置,,在調(diào)整完畢以后,用水泥漿聯(lián)同鐵楔灌滿機(jī)床底,。必須待水泥漿結(jié)硬后,,才允許旋緊基礎(chǔ)螺母,并且要隨時(shí)注意機(jī)床的水平度,。
Hangzhou freight elevator load force foundation must be tested prior to installation, concrete foundation should be completely dry and has a hard knot. Hangzhou freight elevators under the machine should be inserted as much iron wedge,before the machine on the basis of fixed, must be accurately calibrated level meter. First level meter vertical correction, and then correct the lateral. Adjust the machine, the table should be parked in the middle position, after the adjustment is completed, the water filled with mud, together with the iron wedge bottom machine. After a hard knot grout must be allowed only tighten the nut base, and to pay attention to the level of the machine.

4,、必須按照升降平臺(tái)潤(rùn)滑表上所規(guī)定的時(shí)間進(jìn)行潤(rùn)滑,在啟用機(jī)床之前,,首先要熟悉各操作用的零件,。在試車(chē)時(shí),把所有在滑軌上的固定裝置松開(kāi),,用手搖轉(zhuǎn)各手輪作全程移動(dòng),,然后接機(jī)動(dòng)部分。
Must be lubricated in accordance with the Hangzhou Huoti lubrication table specified time, before enabling the machine, the first to be familiar with the parts of each operation. When commissioning, all the fixtures on the slide release, with a hand full rotation turn each hand movement, and then the motor parts.
   


咨詢熱線

189-0831-8192